Contact us
Search
Hearth OutpostINSPIRATION · Planning Guides

Planning Guides

Before the Countertop Is Cut: Your Installation Checklist

Before a countertop is cut, the builder needs an exact equipment schedule. A product family, nominal width or inspiration image is not enough to define an opening. Keep the selected configuration and its installation documents together.
Before the Countertop Is Cut: Your Installation Checklist

Keep the details for each appliance together

Record the brand, full manufacturer model, selected options, fuel or electrical configuration and product link. Add the manual title, revision and relevant diagram page. Keep overall dimensions separate from the required opening dimensions.

Record What belongs in it
Identity Full model and selected variant, not only the family name
Documents Installation manual and current specification sheet
Opening Manufacturer’s exact diagram and all qualifiers
Surroundings Required ventilation, clearances and permitted enclosure materials
Movement Door swing, lid movement, drawers and service removal
Utilities Requirements for the appropriate installer to verify
Responsibility Who confirms each item and when

Get the right measurements before cutting

Seeing different measurements? Contact Hearth Outpost with the model number before your countertop is cut. We can help you find the right manufacturer information to share with your installer. Have your installer confirm the opening size before work begins.

If you change an appliance, hinge direction or accessory, send the updated selection to your builder before work starts. Even a small change can affect how the kitchen fits together.

Check the moving parts

The refrigeration guide explains why door swing and front access belong on the plan. A cabinet elevation showing closed doors can miss a conflict between a refrigerator, an open drawer and the person standing in front of them.

Do the same for grill lids, side shelves, access doors and removable equipment. Ask how service personnel will reach or remove each appliance after the kitchen is finished. An enclosure that fits around the appliance is not necessarily serviceable.

Before you give your builder the go-ahead

  • Your builder has the exact appliances and options you ordered.
  • You have shared the installation drawings for those models.
  • Your installer has checked ventilation, clearances, and gas or electrical connections.
  • Door, drawer, lid and service movements have been checked.
  • Any measurement questions are answered before cutting begins.
  • Your builder and installer have the same up-to-date plans.

The worksheet below gives you a PDF of your installation notes. Repeat it for each appliance and retain the installation documents themselves; notes do not replace the original diagrams. After installation, transfer confirmed model and service details into the equipment record.

Your plans, in one place

Equipment handoff record

Use these prompts to turn the guide into a working record. Add the exact model documents where relevant.

Notes stay in this browser when storage is available. They are not sent to Hearth Outpost. Avoid entering payment details or other sensitive information.